Here’s something most Abbotsford homeowners don’t realize until it’s too late: BC has no mandatory licensing for general renovation contractors. Unlike electricians or gas fitters — who must hold trade qualifications — anyone can print business cards that say “renovation contractor” and start quoting your kitchen. That makes the questions you ask before hiring the single most important part of your renovation.
This checklist is written for BC homeowners. It covers what to ask, why each question matters, what a good answer sounds like, and the red flags that should send you walking. Bring it to every quote meeting.
Note: This guide is general information for BC homeowners, not legal advice. For disputes, BC’s Consumer Protection BC and the Civil Resolution Tribunal are the relevant bodies — but the whole point of this checklist is to never need them.
1. “Are you insured, and can I see proof?”
This is question one, always. A legitimate contractor carries commercial general liability insurance — typically $2 million in coverage — and should be able to show you a current certificate without hesitation. Some will even have their broker email it to you directly, which is the gold standard because it can’t be faked in Photoshop.
Why it matters: if a worker drops a cast-iron tub through your floor, or a plumbing connection fails and floods your basement, liability insurance is what pays for the damage. Without it, you’re chasing an individual in small claims court — or eating the cost yourself.
Red flag: “I’ve never needed it.” Walk away.
2. “Do you have active WorkSafeBC coverage?”
In BC, any contractor with workers — including subcontractors — must be registered with WorkSafeBC and in good standing (verifiable on WorkSafeBC’s website). If a worker is injured on your property and the contractor has no coverage, you can be deemed the employer and held liable. A contractor who says “I only use subcontractors, so I don’t need it” is misinformed or lying — the prime contractor is responsible for ensuring subs are covered too.
Good answer: “Here’s my WorkSafeBC account number — you can look it up.” Takes thirty seconds to verify on their website.
3. “Can I see three recent references — and visit a finished job?”
Reviews on Google are a start, but references are better, and seeing finished work in person is best. Ask for three projects completed in the last year, ideally similar in scope to yours. Then actually call them, and ask if you can see one finished kitchen or bathroom.
What to ask the references: did the project finish on schedule, and how were delays communicated? Did the final price match the quote — what changed, and why? How was the crew to have in your house day after day? And the big one: would you hire them again?
Red flag: references that are all five years old, or “I don’t give out clients’ numbers.” Established contractors have recent happy clients.

4. “Will you provide a detailed written quote — not just a price?”
A number on a napkin is not a quote. A proper quote is itemized: demolition, plumbing, electrical, cabinetry, countertops, tile, drywall, paint — each with its own line, plus allowances for fixtures you’ve yet to pick.
Why it matters: you cannot compare three contractors’ prices unless you can compare them line by line. A $42,000 quote that includes everything and a $36,000 quote that excludes flooring, paint, and permits are not $6,000 apart — the “cheaper” one is more expensive. Vague quotes also give a contractor room to pad the bill with extras later.
Red flag: “I’ll give you a great price, don’t worry about the details.” The details are the entire point.
5. “Who pulls the permits, and are permit fees included?”
In Abbotsford, kitchen and bathroom renovations involving plumbing, electrical, or structural work require building permits from the City of Abbotsford (Building Department, 32315 S Fraser Way), and they take about 2–4 weeks to be issued. A professional contractor pulls the permits themselves and includes the fees in the quote.
Why it matters: unpermitted work is one of the costliest renovation mistakes a homeowner can make — stop-work orders, insurance complications, and deals that die when a buyer’s lender asks for permit records. If a contractor suggests skipping permits to “save time and money,” find another contractor.
Good answer: “We handle all permits and inspections — fees are in the quote, and we won’t start demo until the permit’s issued.”
6. “Who will actually be doing the work — your crew or subcontractors?”
Many renovation companies are essentially project managers: they sell the job and sub out the plumbing, electrical, tile, and drywall. That’s not necessarily bad — specialists often do better work — but ask which trades are in-house, how long they’ve worked with their subs, and whether subs are covered under the contractor’s WorkSafeBC and liability insurance.
Why it matters: the quality of your renovation is the quality of the worst sub on the job. A contractor with a stable crew they’ve worked with for years is a fundamentally different proposition from one who finds whoever’s available that week.
Red flag: evasiveness about who’ll be in your house, or day labour picked up per-job.

7. “What is the payment schedule?”
Standard practice in BC: a deposit of 10–15% to book the job and order materials, then milestone payments tied to completed stages, with a final holdback of 10% released when the work is complete and deficiencies are fixed.
That 10% holdback isn’t just custom — it’s your right under BC’s Builders Lien Act, protecting you if an unpaid subcontractor files a lien against your property. Never waive it, and be deeply suspicious of anyone who asks you to.
Red flags: demands for 50% upfront, cash-only deals, or pressure to skip the holdback. A contractor who needs your deposit to buy materials for your job has cash-flow problems — and those become your unfinished kitchen.
8. “What is the timeline, and what happens if you run over?”
Get a start date and a realistic completion date in writing, plus an understanding of what causes delays — material lead times (custom cabinets can take 6–10 weeks), permit processing (2–4 weeks in Abbotsford), and inspection scheduling all bite before a hammer swings. Then ask what happens if the project runs over through the contractor’s fault: at minimum, they should commit to keeping a crew on your job until it’s done rather than bouncing between projects.
Red flag: “We’ll start when we can and it’ll take as long as it takes.” Also watch for contractors juggling far more jobs than their crew can handle — ask how many projects they’re running right now.
9. “How do you handle changes and extras?”
Mid-project changes are where renovation budgets go to die — the number-one source of overruns and disputes industry-wide. A professional has a written change-order process: any scope change gets priced, written up, and signed by you before the work happens. No verbal agreements, no “we’ll figure it out at the end.”
Red flag: “Don’t worry, we’ll work it out.” You will work it out, at the end, when you have no leverage and the number is twice what you expected. Get the process in writing upfront.
10. “Do you warranty your work, and what does it cover?”
Reputable BC renovation contractors warranty their workmanship — typically one to two years, separate from manufacturer warranties on materials. Get the terms in writing: what’s covered, for how long, and how to make a claim. Grout cracks, a sagging cabinet door, a failed caulk line — small deficiencies show up in the first year of any renovation, and a contractor who stands behind their work fixes them without drama.
Red flag: no written warranty, or “if something goes wrong, just call me” with nothing on paper.
Quick Reference: Green Flags vs Red Flags
| Green flag ✅ | Red flag 🚩 |
|---|---|
| Shows insurance certificate and WorkSafeBC number unprompted | Can’t or won’t provide proof of insurance |
| Itemized written quote with allowances spelled out | Single lump-sum price, no breakdown |
| Pulls permits and includes fees | Suggests skipping permits to save money |
| Recent local references you can visit | No references, or only old ones |
| 10–15% deposit, milestone payments, 10% holdback | Large upfront cash payment demanded |
| Written change-order process | Verbal “we’ll figure it out” on extras |
| 1–2 year written workmanship warranty | No warranty in writing |
| Realistic timeline with a start date | Vague timeline, too many concurrent jobs |
| Stable crew or long-term subcontractors | Can’t say who’ll be doing the work |
| Communicates clearly and promptly during quoting | Hard to reach before you’ve even hired them |
That last one deserves emphasis: how a contractor communicates during the quoting stage is the best they’ll ever communicate. If they’re slow, vague, or flaky before they’ve been paid a dollar, imagine mid-project with your kitchen gutted.
Contractor Hiring FAQ — BC
Do renovation contractors need to be licensed in BC?
General renovation contractors are not required to hold a provincial licence in BC — unlike electricians, plumbers, and gas fitters, who must be ticketed. This is exactly why verifying insurance, WorkSafeBC coverage, references, and written contracts matters so much.
How much deposit should I pay a renovation contractor in BC?
10–15% is standard to secure your spot and cover initial material orders. Be wary of anyone demanding 50% or more upfront, cash-only payments, or full payment before completion. Always keep a 10% holdback until the work is finished and deficiencies are resolved — this is your right under BC’s Builders Lien Act.
How do I check a contractor’s WorkSafeBC coverage?
Ask for their WorkSafeBC account number, then verify it through WorkSafeBC’s online employer lookup. Confirm the account is active and in good standing. If a contractor uses subcontractors, confirm those subs are covered too — as the prime contractor, they’re responsible for that.
Should I get multiple quotes for a renovation?
Yes — three itemized written quotes minimum. Not three prices: three detailed, line-by-line quotes you can compare directly. For a mid-range Abbotsford kitchen ($34,000–$55,000), quotes more than 15–20% apart usually mean the scopes aren’t the same — the cheapest one is often missing things the others included.
What should I do if a contractor does bad work or disappears?
Document everything — photos, the contract, all messages, payment records. In BC, you can file a complaint with Consumer Protection BC and pursue claims through the Civil Resolution Tribunal (up to $5,000) or small claims court. This is why the written contract, itemized quote, and milestone payments from this checklist matter: without documentation, you have very little to stand on.
Is it normal for a contractor to ask for cash to “save the tax”?
It’s common, and you should decline. Cash deals mean no paper trail — no receipt, no enforceable contract, no provable warranty. If something goes wrong, you have no record the transaction happened. Legitimate contractors operate above board.
For more guides and project planning help, visit Home Renovation Abbotsford, where we publish 2026 cost breakdowns for kitchens, bathrooms, basements and whole-home projects across the Fraser Valley.
Hiring With Confidence
The right contractor won’t be annoyed by these questions — they’ll be relieved. Professionals like informed clients: clear contracts, on-schedule payments, no disputes. If someone gets defensive about basic due diligence, they’ve told you everything you need to know.
If you’re planning a kitchen project and want to see what a properly scoped renovation looks like, browse our kitchen renovation services in Abbotsford for what’s typically included at each project level — plus our guides to bathroom renovations and basement finishing.
Note: Costs referenced here are 2026 Abbotsford/Fraser Valley market ranges for planning purposes, not a quote. This article is general information, not legal advice.
4 Responses